— Proelectric

Vista Azul

In Progress

Supply and installation of the electrical substation for the Vista Azul project, featuring a 125 KVA three-phase transformer.

Vista Azul
— About the project

Project overview

Grupo IDUK is delivering the electrical substation for the Vista Azul project, an installation that combines the supply and mounting of a 125 KVA three-phase transformer with the full service-transition and feeder infrastructure. The work includes excavation with compact machinery (mini excavator) and controlled demolition of slabs and floors using pneumatic tools to trace the underground raceway. PVC conduits for medium and low voltage are laid over sand beds to ensure mechanical protection of the conductors. Our crew sets and levels concrete pull boxes that house the transition between the utility network and the interior installation, along with the pads for the transformer and meters. Every stage is executed under strict safety criteria, jobsite signage, and regulatory compliance, with concrete finishes on lids and frames.

Scope of service

  • Supply and mounting of 125 KVA three-phase transformer
  • Excavation and electrical service transition
  • Underground conduit routing over sand bed
  • Pads for transformer and metering equipment
  • Testing, energization, and commissioning